Theoretical yield: 12-14 m² with a 20 kg pack; 2.5–2.8 m² with a 4 kg pack.
Dilution: ready to use.
Drying time: dust-free in 1-2 hours, fully dry in 12-24 hours. The times are to be considered under optimal environmental conditions (temp. +5°C / +30°C, UM < 70% ) and vary depending on the thickness applied.